ICCBEI 2025: Volume InformationProceedings of The Sixth International Conference on Civil and Building Engineering Informatics98 articles•1174 pages•Published: August 28, 2025 PapersPart 1: Digital Twins and BIM Technologies | Xun Lu and Yantao Yu 1-15 | Sucheng Rui, Koji Makanae, Jun Liu, Makoto Fujiu and Yuma Morisaki 16-26 | Xuhong Huang and Yantao Yu 27-41 | Khuvilai Erdene, Sung Hoon Kim and Sang-Ho Lee 42-55 | Limei Chen, Zhigang Guo, Yi Tan and Penglu Chen 56-71 | Yuqing Xu, Xingbo Gong, Helen H.L. Kwok and Jack C.P. Cheng 72-81 | Tao Yang, Yang Zou and Enrique del Rey Castillo 82-93 | Xinyu Tong, Cheng Zhang, Jingyu Zhou and Yiping Dong 94-104 | Zhiyang Pan, Yichong Zhang, Yujie Lu and Bing Tang 105-116 | Part 2: Construction Safety and Worker Well-being | Angelina Aziz and Markus König 117-128 | Fei Tian and Yantao Yu 129-142 | Masood Khan, Joon Oh Seo, Maxwell Fordjour Antwi-Afari and Yuan Zhou 143-152 | Ting Lei, Kelvin Holam Heung and Joon Oh Seo 153-163 | Yuting Zhang, Xinyu Pan and Jiayu Chen 164-172 | Chia-Chun Lin and Albert Y. Chen 173-182 | Ying Liang, Yi Tan and Dong Jia 183-195 | Ziyao Dong, Yangbing Zhang, Yuejiang Su, Yingqiao Fang, Yilin Huang and Siyang Zheng 196-206 | Part 3: Innovations for Operation and Maintenance | Jiapei Zhao, Nobuyoshi Yabuki and Tomohiro Fukuda 207-221 | Chengzhang Chai, Jiucai Liu, Yan Gao, Guanyu Xiong and Haijiang Li 222-232 | Xuling Ye, Liu Liu and Markus König 233-246 | Xiaosong Liu, Makoto Oda, Kei Kawamura and Tsuyoshi Wakatsuki 247-258 | Yota Chinen, Kei Kawamura and Shuji Sawamura 259-270 | Shiqi Zhang, Jingyuan Tang and Jingke Hong 271-278 | Yuting Duan, Meng Ye and Penglin Dai 279-291 | Yi Gu, Sizhong Qin, Wenjie Liao, Siqi Chen and Xinzheng Lu 292-301 | Luis Fernando Verduzco Martinez and Jack C.P. Cheng 302-315 | Part 4: XR (VR/AR/MR), Visualization, and Simulation | Arisa Kobayashi and Tomohiro Mizoguchi 316-329 | Youde Zheng, Liyun Yao, Silin Li, Yugui Zhou and Yi Tan 330-343 | Tao Zhong, Yujie Lu, Shuo Wang and Xuanjun Li 344-355 | Shuo Wang, Yujie Lu, Tao Zhong, Lijian Zhong and Yufan Chen 356-367 | Wenyu Li, Xinyu Chen and Yantao Yu 368-379 | Hongzhe Yue and Qian Wang 380-389 | Lizhuang Cui, Lei Kou, Hanming Zhang, Feng Guo and Jian Liu 390-399 | May Thin Zar Soe, Nobuyoshi Yabuki, Tomohiro Fukuda and Yoshiro Hada 400-413 | Siwei Lin, Liping Duan, Bin Jiang and Jincheng Zhao 414-424 | Part 5: Advancing Construction through Robotics and Human Machine Collaboration | Haojun Luo and Yantao Yu 425-439 | Zhida Zhang, Fanfan Meng, Mun On Wong and Mi Pan 440-452 | Bing Sun, Chao Mao, Wen Yi and Tingpeng Wang 453-463 | Yuan Yao, Vivian Tam, Jun Wang, Khoa Le, Anthony Butera and Wenchi Shou 464-472 | Jiucai Liu, Chengzhang Chai, Linghan Ouyang and Haijiang Li 473-485 | Xiaohu Yu, Yantao Yu and Zaolin Pan 486-498 | Fangzheng Li, Hung Lin Chi, Rongyan Li, Roy Dong Wang, Tarek Zayed and Bo Xiao 499-510 | Yilin Wang, Chao Mao and Tingpeng Wang 511-523 | Tong Liu, Song Du, Fei Teng and Yiwei Weng 524-529 | Part 6: Large Model and Intelligent Building Operation and Maintenance | Zhen Zhang, Yang Zou, Brian H.W. Guo, Lixin Jiang, Johannes Dimyadi and Roy Davies 530-542 | Kai Li, Chao Dong, Xueqing Fang and Da Li 543-557 | Xueying Zhu and Jun Ma 558-569 | Jiaying Zhang, Jeff Chak Fu Chan, Ziyu Zhao and Jack C.P. Cheng 570-577 | Zhengxing Chen, Yang Zou, Vicente González, Jason Ingham and Liam Wotherspoon 578-588 | Ang Li, Peter Kok-Yiu Wong, Xingyu Tao and Jack C.P. Cheng 589-600 | Zhenyu Liang, Jeff Chak Fu Chan, Jiaying Zhang, Zhaolun Liang, Boyu Wang, Mingzhu Wang and Jack C.P. Cheng 601-611 | Xingbo Gong, Yuqing Xu, Helen H.L. Kwok, Xingyu Tao and Jack C.P. Cheng 612-622 | Sihao Li, Guangyao Chen, Yangze Liang and Zhao Xu 623-633 | Part 7: Sustainable Construction and Development | Zhaoji Wu, Wenli Liu, Jack C.P. Cheng, Zhe Wang, Helen H.L. Kwok, Cong Huang and Fangli Hou 634-646 | Zheng Li and Jun Ma 647-655 | Cheng Chang, Francesco Di Maio and Peter Rem 656-667 | Xiaohan Xu, Cheng Zhang, Yunfei Xia, Xiaohui Zhu and Peter Burgess 668-679 | Xujing Yu and Jun Ma 680-690 | Silvia Meschini, Daniele Accardo, Lavinia Chiara Tagliabue, Stefano Rinaldi, Rosa Meo, Andrea Bracciali and Giuseppe Martino Di Giuda 691-705 | Mohammad Saleh Nikoopayan Tak, Reyhaneh Moazami Goodarzi and Yanxiao Feng 706-719 | Part 8: OpenBIM and Generative Design | Cheng-Wen Fu, Tzong-Hann Wu, Yun-Tsui Chang and Shang-Hsien Hsieh 720-731 | Rui Kang, Stephen Green and Ioannis Brilakis 732-743 | Haolan Zhang and Ruichuan Zhang 744-755 | Atsuya Ogura, Tomohiro Fukuda, Nobuyoshi Yabuki and Taro Narahara 756-769 | Zheng Zhao, Weiya Chen, Zhiyuan Guo and Wenming Jiang 770-780 | Part 9: AI for Safety and Health in Building Environment | Mohammed Alduais, Xinming Li and Qipei Mei 781-791 | Min Jae Lee and Ruichuan Zhang 792-803 | Jin Han, Zhe Zheng, Zhen Xu, Xinzheng Lu and Jia-Rui Lin 804-816 | Fangzhou Lin, Zhengyi Chen, Xiao Zhang, Boyu Wang and Jack C.P. Cheng 817-828 | Dayou Chen, Long Chen, Yiheng Zeng, Craig Hancock, Russell Lock and Simon Sølvsten 829-840 | Zeyu Pan and Jianyong Shi 841-853 | Part 10: Information Management in Design and Maintenance | Honghu Chu, Weiwei Chen and Lu Deng 854-867 | Alexander Buttgereit and Stefan Gomolluch 868-882 | Xinyue Zhou and Sheng Xu 883-893 | Chak-Fu Chan, Xiaowen Guo, Peter Kok-Yiu Wong, Jolly Pui-Ching Chan, Jack C.P. Cheng, Pak-Him Leung and Xingyu Tao 894-908 | Xichen Chen, Ali Ghaffarianhoseini and Amirhosein Ghaffarianhoseini 909-922 | Jianyong Shi, Zeyu Pan, Longfei Pan and Junpeng Hu 923-932 | Gabriele Fredduzzi, Baruch Manigrasso and Nerminko Omanic 933-946 | Part 11: AI in Construction: Innovations, Risks, and Best Practices | Yu-Wen Wu, Nofel Lagrosas, Sheng-Hsiang Wang and Albert Y. Chen 947-958 | Zhiyao Tian and Xianfei Yin 959-969 | Yoshihiro Yasumuro, Youta Tanaka and Satoshi Kubota 970-978 | Matt Stevens, Wei Zhou and Babatunde Ogunbayo 979-989 | Mohamed Abdelwahab Hassan Mohamed, M.K.S. Al-Mhdawi, Farzad Rahimian, Udechukwu Ojiako, Alan O'Connor and Charf Mahammedi 990-996 | Part 12: Digital Twins for Building and Infrastructure Maintenance | Weiwei Chen, Yang Su, Alwyn Mathew and Ioannis Brilakis 997-1008 | Tomohiro Mizoguchi 1009-1017 | Wei Shen, Tao Liu, Guangjian Wang, Hu Yu, Hang Gao and Xianlei Wang 1018-1033 | Guanyu Xiong, Yan Gao, Chengzhang Chai, Kehong Chen and Haijiang Li 1034-1042 | Mengtian Yin, Tom Kelly, Pieter Pauwels, Liming Xu, Brian Sheil, Junxiang Zhu, Yue Xie and Ioannis Brilakis 1043-1057 | Part 13: Education and Training in Construction | Zhaoxin Zhang, Zaolin Pan, Yantao Yu and Liang Liu 1058-1069 | Yu Wu, Kuan-Chen Chin, Jen-Tang Sun, Ying-Chih Ko, Wen-Chu Chiang, Matthew Huei-Ming Ma and Albert Y. Chen 1070-1079 | Hamidreza Alavi, Brian Sheil and Ioannis Brilakis 1080-1088 | Jingfeng Yuan, Lingxiao Wang, Feixiang Hu, Yang Su, Chen Li, Hao Tian and Weidong Lin 1089-1101 | Chengliang Zheng, Xingyu Tao, Jiarui Lin, Moumita Das, Wenchi Shou and Jack C.P. Cheng 1102-1112 | Wai Hung Lee and Fan Xue 1113-1125 | Part 14: Digital Campus | Koji Makanae, Yugo Kurokawa, Kiyotaka Suda, Jevica and Nurulnajwa Binti Khamis 1126-1135 | Tomohide Yuasa and Kodai Yamamoto 1136-1149 | Xuefei Yuan, Benchen Fu, Shan Man and Yuanyuan Wei 1150-1163 | Norihiko Goto, Hiroaki Date and Satoshi Kanai 1164-1174 |
Keyphrases3D building layout, 3D concrete printing, 3D model, 3D modeling, 3D point cloud, 3D reconstruction4, 3D Scanner Gocator, 3D scanning, AABB Tree, Adaptor Networks, AED, Aerial Construction Factory, AI Accuracy, AI-driven design, Air Terminals, Airborne point clouds, architectural design, Assessment and mapping, Asset Management, Attention-based Multimodal Fusion, Augmented Reality, Automated compliance checking (ACC)2, Automated rule checking (ARC), Automated Scheduling, Automation, Automation potential, awkward posture, Back Exoskeleton, Bayesian method, BERT, BiFPN, BIM11, BIM adoption challenges, BIM/CIM, Blockchain4, Bridge damage, Bridge Inspection2, bridge maintenance, bridge point cloud, Building condition index, Building decay, building design, Building equipment, Building Information Modeling3, Building Information Modeling (BIM)2, Building Information Modelling, Building performance prediction, built heritage, CAD, CAE, CBAM, cde, citizen participation, city, Civil Engineering Education, Civil Engineers, climate change, Cloud, collaborative management, commercial spaces, Common Data Environment, Compliance Checking, computer vision4, concept, Concrete recycling, CONNECTIA, Constructability, construction2, Construction 5.0 (C5.0), construction contracting, Construction Equipment, Construction Health, Construction Industry2, Construction Management, Construction Risk Management2, construction robot4, Construction Robotics, Construction Site Safety Monitoring, Construction Software, construction task, Construction tools, Conveyor Belt, Convolutional Neural Network, CoT, Crack Segmentation, Crowdsourcing, curriculum development, curtain wall, Danger analysis, Data-Efficient Fine-tuning Strategy, data integration, data management, data transmission, dataset, debris flow2, decision making, deep learning9, defect detection, Defect segmentation, design strategies, Differential Render, diffusion model2, Digital Delivery, digital technology, Digital Transformation, Digital Twin8, Digital Twins, Discrete Event Simulation, distributed systems, Domain-Tailored Large Vision-Language Model, Drawing processing, Drones, DX, Education, efficient simulation, Electroencephalograph (EEG), Embodied carbon assessment, EMG, EMS, Enclosure Walls, energy consumption, engineering and construction, Equipment Detection, Ergonomic, ergonomic risk, ESG (Environmental Social and Governance), ESG decision-making, Evacuation performance simulation, external load, eye tracking, Facade photovoltaic potential, Fall, false alarm rate, FEM, FEMA P-58, fine-tuning, Fire Safety Compliance, Fire Safety Equipment, Fire safety inspection, Floor Area Calculation, Floorplan generation, Frame skip, game engine, GAT, gaze estimation, GenAI risks, Generative AI2, Generative AI design, generative design2, Genetic Algorithm, geometric digital twinning, Geometric quality inspection, Geometry extraction, GIS, Graph Attention Network, Graph Neural Network3, Graph Neural Networks2, graph theory, Grasping, Ground-based cloud images, ground reaction forces, Hand Gesture, heritage building, Heritage Building Information Modeling, high resolution image, Highway maintenance, Historical buildings, HoloLens, housing supply, Human-AI Trust, Human-Centered Robotics, human-machine collaboration, human-machine interaction, Human-Robot Collaboration, Human-Robot Collaboration (HRC), hydropower plant, ICT Efficacy, IFC3, IFC Information Extraction, image representation, image retrieval, image segmentation, Implementation Framework, implication, indoor environment quality, Indoor Environment Simulation, Indoor modeling, Industry 5.0 (I5.0), Information Container, Information Extraction, information management2, Infrastructure maintenance, Infrastructure resilience, Initial Velocity, Inspection, instance segmentation, Institutional pressure, Integrated knowledge base, Intelligent construction, intention recognition, Interaction force, interior design, International contractors, Internet of Things (IoT), job-housing balance, Kalman filter, Key Performance Indicators, Knowledge Graph3, Knowledge Management, Language-embedded 3D Gaussian Splatting, Large Language Model (LLM)2, large language models2, Large-scale prefabricated storage yard, Laser-induced breakdown spectroscopy (LIBS), laser scanning2, layout design, learned image compression, LiDAR2, Life Cycle Assessment, Lifting safety, Lightweight Transfer Learning, limited data, LLM2, LLM Agent, Load inversion, LOOK Algorithm, low back pain, low-light environment, LSTM2, machine learning2, machine vision, Maintenance, Markov Decision Process (MDP), Masonry structure, MEP2, meta-learning, MIC, Mixed Reality, Mobile monitoring, model conversion, Mongolian Construction Industry, motion recognition, multi-label text classification, Multi-modal Safety Compliance Checking, multi-objective optimization2, Multi-occupancy Building Layout, multi-robot coordination, Multimodal Large Language Models, natural disasters, natural language interaction, Natural Language Processing2, nearest neighbor, NeRF (Neural Radiance Fields), New citizens, NFT, Night clouds, NSGA-III, object detection4, object tracking2, Offsite Construction2, OHCA, open data, Operational Phase Monitoring, Panoramic inspection, Performance-based evaluation, PESTLE analysis, pickup and delivery problems, Plastics Waste dataset, PM2.5, point cloud3, point cloud completion, positions, Practice Alignment, prefabricated components, Problem-Based Learning (PBL), process optimisation, professional practice, Progress identification, Prompt Pattern, public procurement, quality control, quality inspection, quality visualization, ray tracing, RC frame structures, Rebar Design, Rebar Inspections, recovery, Recycled coarse aggregates (RCA), Reinforced concrete beams, Reinforcement Learning, Rendering technique, Residential block, response time, review, risk perception, Road infrastructure, Road Maintenance2, Road pavement management, robot adoption, Robots, RULA, safety in construction, safety management, Scan-to-BIM, Scene Understanding, scheduling optimization, Segment Anything Model, seismic loss estimation, Semantic enriched, semantic segmentation2, semantic segmentation model, simulation, Simultaneous Localization and Mapping, Skill Enhancement, slip, Small sample training, smart contract3, SMEs, solar irradiation prediction, spatial analysis, Spatial Relationship Query, Spatial vitality, Spatio-temporal heterogeneity, sports venues, Streetlight detection, Structural component size design, Structural Engineering, Structural Health Monitoring, student engagement, Substation, surface reconstruction, surrogate model, survey, Sustainability3, Sustainable building design, Sustainable Development Goals (SDGs), SWOT analysis, Synthetic point cloud, task allocation, task complexity, Technology Acceptance Model, technology adoption, Technology Misalignment, Technology Readiness Level, Tender phase, Three-dimensional modeling, Tower crane layout planning, Tower crane operators, traffic safety, Trans-dimensional Markov chain, transformer2, Transmission and Distribution networks, Treadmill, Trip, tunnel, tunnel construction, UAV remote sensing, UAV/UGV integration, Underground structures, UNet, UNet++, Unity, Unmanned Aerial Vehicle (UAV), User Discomfort, vacant housing, Virtual Construction Safety Assistant, Virtual Reality, Virtual scan, Vision language model (VLM), Vision Large Language Models (vLLM), visual positioning, Visual Question Answering (VQA), Visual SLAM, voxel, waste management, Water Body Segmentation, wearable robots, web-based application, Welding operations, WMSD, Worker Acceptance, Worker-robot collaboration, Worker Trajectory Prediction, YOLOv10-N, YOLOv5. |
|