ICCBEI 2025: Volume Information

Proceedings of The Sixth International Conference on Civil and Building Engineering Informatics

Editors: Jack Cheng and Yu Yantao
98 articles1174 pagesPublished: August 28, 2025

Papers

Part 1: Digital Twins and BIM Technologies
Xun Lu and Yantao Yu
1-15
Sucheng Rui, Koji Makanae, Jun Liu, Makoto Fujiu and Yuma Morisaki
16-26
Xuhong Huang and Yantao Yu
27-41
Khuvilai Erdene, Sung Hoon Kim and Sang-Ho Lee
42-55
Limei Chen, Zhigang Guo, Yi Tan and Penglu Chen
56-71
Yuqing Xu, Xingbo Gong, Helen H.L. Kwok and Jack C.P. Cheng
72-81
Tao Yang, Yang Zou and Enrique del Rey Castillo
82-93
Xinyu Tong, Cheng Zhang, Jingyu Zhou and Yiping Dong
94-104
Zhiyang Pan, Yichong Zhang, Yujie Lu and Bing Tang
105-116
Part 2: Construction Safety and Worker Well-being
Angelina Aziz and Markus König
117-128
Fei Tian and Yantao Yu
129-142
Masood Khan, Joon Oh Seo, Maxwell Fordjour Antwi-Afari and Yuan Zhou
143-152
Ting Lei, Kelvin Holam Heung and Joon Oh Seo
153-163
Yuting Zhang, Xinyu Pan and Jiayu Chen
164-172
Chia-Chun Lin and Albert Y. Chen
173-182
Ying Liang, Yi Tan and Dong Jia
183-195
Ziyao Dong, Yangbing Zhang, Yuejiang Su, Yingqiao Fang, Yilin Huang and Siyang Zheng
196-206
Part 3: Innovations for Operation and Maintenance
Jiapei Zhao, Nobuyoshi Yabuki and Tomohiro Fukuda
207-221
Chengzhang Chai, Jiucai Liu, Yan Gao, Guanyu Xiong and Haijiang Li
222-232
Xuling Ye, Liu Liu and Markus König
233-246
Xiaosong Liu, Makoto Oda, Kei Kawamura and Tsuyoshi Wakatsuki
247-258
Yota Chinen, Kei Kawamura and Shuji Sawamura
259-270
Shiqi Zhang, Jingyuan Tang and Jingke Hong
271-278
Yuting Duan, Meng Ye and Penglin Dai
279-291
Yi Gu, Sizhong Qin, Wenjie Liao, Siqi Chen and Xinzheng Lu
292-301
Luis Fernando Verduzco Martinez and Jack C.P. Cheng
302-315
Part 4: XR (VR/AR/MR), Visualization, and Simulation
Arisa Kobayashi and Tomohiro Mizoguchi
316-329
Youde Zheng, Liyun Yao, Silin Li, Yugui Zhou and Yi Tan
330-343
Tao Zhong, Yujie Lu, Shuo Wang and Xuanjun Li
344-355
Shuo Wang, Yujie Lu, Tao Zhong, Lijian Zhong and Yufan Chen
356-367
Wenyu Li, Xinyu Chen and Yantao Yu
368-379
Hongzhe Yue and Qian Wang
380-389
Lizhuang Cui, Lei Kou, Hanming Zhang, Feng Guo and Jian Liu
390-399
May Thin Zar Soe, Nobuyoshi Yabuki, Tomohiro Fukuda and Yoshiro Hada
400-413
Siwei Lin, Liping Duan, Bin Jiang and Jincheng Zhao
414-424
Part 5: Advancing Construction through Robotics and Human Machine Collaboration
Haojun Luo and Yantao Yu
425-439
Zhida Zhang, Fanfan Meng, Mun On Wong and Mi Pan
440-452
Bing Sun, Chao Mao, Wen Yi and Tingpeng Wang
453-463
Yuan Yao, Vivian Tam, Jun Wang, Khoa Le, Anthony Butera and Wenchi Shou
464-472
Jiucai Liu, Chengzhang Chai, Linghan Ouyang and Haijiang Li
473-485
Xiaohu Yu, Yantao Yu and Zaolin Pan
486-498
Fangzheng Li, Hung Lin Chi, Rongyan Li, Roy Dong Wang, Tarek Zayed and Bo Xiao
499-510
Yilin Wang, Chao Mao and Tingpeng Wang
511-523
Tong Liu, Song Du, Fei Teng and Yiwei Weng
524-529
Part 6: Large Model and Intelligent Building Operation and Maintenance
Zhen Zhang, Yang Zou, Brian H.W. Guo, Lixin Jiang, Johannes Dimyadi and Roy Davies
530-542
Kai Li, Chao Dong, Xueqing Fang and Da Li
543-557
Xueying Zhu and Jun Ma
558-569
Jiaying Zhang, Jeff Chak Fu Chan, Ziyu Zhao and Jack C.P. Cheng
570-577
Zhengxing Chen, Yang Zou, Vicente González, Jason Ingham and Liam Wotherspoon
578-588
Ang Li, Peter Kok-Yiu Wong, Xingyu Tao and Jack C.P. Cheng
589-600
Zhenyu Liang, Jeff Chak Fu Chan, Jiaying Zhang, Zhaolun Liang, Boyu Wang, Mingzhu Wang and Jack C.P. Cheng
601-611
Xingbo Gong, Yuqing Xu, Helen H.L. Kwok, Xingyu Tao and Jack C.P. Cheng
612-622
Sihao Li, Guangyao Chen, Yangze Liang and Zhao Xu
623-633
Part 7: Sustainable Construction and Development
Zhaoji Wu, Wenli Liu, Jack C.P. Cheng, Zhe Wang, Helen H.L. Kwok, Cong Huang and Fangli Hou
634-646
Zheng Li and Jun Ma
647-655
Cheng Chang, Francesco Di Maio and Peter Rem
656-667
Xiaohan Xu, Cheng Zhang, Yunfei Xia, Xiaohui Zhu and Peter Burgess
668-679
Xujing Yu and Jun Ma
680-690
Silvia Meschini, Daniele Accardo, Lavinia Chiara Tagliabue, Stefano Rinaldi, Rosa Meo, Andrea Bracciali and Giuseppe Martino Di Giuda
691-705
Mohammad Saleh Nikoopayan Tak, Reyhaneh Moazami Goodarzi and Yanxiao Feng
706-719
Part 8: OpenBIM and Generative Design
Cheng-Wen Fu, Tzong-Hann Wu, Yun-Tsui Chang and Shang-Hsien Hsieh
720-731
Rui Kang, Stephen Green and Ioannis Brilakis
732-743
Haolan Zhang and Ruichuan Zhang
744-755
Atsuya Ogura, Tomohiro Fukuda, Nobuyoshi Yabuki and Taro Narahara
756-769
Zheng Zhao, Weiya Chen, Zhiyuan Guo and Wenming Jiang
770-780
Part 9: AI for Safety and Health in Building Environment
Mohammed Alduais, Xinming Li and Qipei Mei
781-791
Min Jae Lee and Ruichuan Zhang
792-803
Jin Han, Zhe Zheng, Zhen Xu, Xinzheng Lu and Jia-Rui Lin
804-816
Fangzhou Lin, Zhengyi Chen, Xiao Zhang, Boyu Wang and Jack C.P. Cheng
817-828
Dayou Chen, Long Chen, Yiheng Zeng, Craig Hancock, Russell Lock and Simon Sølvsten
829-840
Zeyu Pan and Jianyong Shi
841-853
Part 10: Information Management in Design and Maintenance
Honghu Chu, Weiwei Chen and Lu Deng
854-867
Alexander Buttgereit and Stefan Gomolluch
868-882
Xinyue Zhou and Sheng Xu
883-893
Chak-Fu Chan, Xiaowen Guo, Peter Kok-Yiu Wong, Jolly Pui-Ching Chan, Jack C.P. Cheng, Pak-Him Leung and Xingyu Tao
894-908
Xichen Chen, Ali Ghaffarianhoseini and Amirhosein Ghaffarianhoseini
909-922
Jianyong Shi, Zeyu Pan, Longfei Pan and Junpeng Hu
923-932
Gabriele Fredduzzi, Baruch Manigrasso and Nerminko Omanic
933-946
Part 11: AI in Construction: Innovations, Risks, and Best Practices
Yu-Wen Wu, Nofel Lagrosas, Sheng-Hsiang Wang and Albert Y. Chen
947-958
Zhiyao Tian and Xianfei Yin
959-969
Yoshihiro Yasumuro, Youta Tanaka and Satoshi Kubota
970-978
Matt Stevens, Wei Zhou and Babatunde Ogunbayo
979-989
Mohamed Abdelwahab Hassan Mohamed, M.K.S. Al-Mhdawi, Farzad Rahimian, Udechukwu Ojiako, Alan O'Connor and Charf Mahammedi
990-996
Part 12: Digital Twins for Building and Infrastructure Maintenance
Weiwei Chen, Yang Su, Alwyn Mathew and Ioannis Brilakis
997-1008
Tomohiro Mizoguchi
1009-1017
Wei Shen, Tao Liu, Guangjian Wang, Hu Yu, Hang Gao and Xianlei Wang
1018-1033
Guanyu Xiong, Yan Gao, Chengzhang Chai, Kehong Chen and Haijiang Li
1034-1042
Mengtian Yin, Tom Kelly, Pieter Pauwels, Liming Xu, Brian Sheil, Junxiang Zhu, Yue Xie and Ioannis Brilakis
1043-1057
Part 13: Education and Training in Construction
Zhaoxin Zhang, Zaolin Pan, Yantao Yu and Liang Liu
1058-1069
Yu Wu, Kuan-Chen Chin, Jen-Tang Sun, Ying-Chih Ko, Wen-Chu Chiang, Matthew Huei-Ming Ma and Albert Y. Chen
1070-1079
Hamidreza Alavi, Brian Sheil and Ioannis Brilakis
1080-1088
Jingfeng Yuan, Lingxiao Wang, Feixiang Hu, Yang Su, Chen Li, Hao Tian and Weidong Lin
1089-1101
Chengliang Zheng, Xingyu Tao, Jiarui Lin, Moumita Das, Wenchi Shou and Jack C.P. Cheng
1102-1112
Wai Hung Lee and Fan Xue
1113-1125
Part 14: Digital Campus
Koji Makanae, Yugo Kurokawa, Kiyotaka Suda, Jevica and Nurulnajwa Binti Khamis
1126-1135
Tomohide Yuasa and Kodai Yamamoto
1136-1149
Xuefei Yuan, Benchen Fu, Shan Man and Yuanyuan Wei
1150-1163
Norihiko Goto, Hiroaki Date and Satoshi Kanai
1164-1174

Keyphrases

3D building layout, 3D concrete printing, 3D model, 3D modeling, 3D point cloud, 3D reconstruction4, 3D Scanner Gocator, 3D scanning, AABB Tree, Adaptor Networks, AED, Aerial Construction Factory, AI Accuracy, AI-driven design, Air Terminals, Airborne point clouds, architectural design, Assessment and mapping, Asset Management, Attention-based Multimodal Fusion, Augmented Reality, Automated compliance checking (ACC)2, Automated rule checking (ARC), Automated Scheduling, Automation, Automation potential, awkward posture, Back Exoskeleton, Bayesian method, BERT, BiFPN, BIM11, BIM adoption challenges, BIM/CIM, Blockchain4, Bridge damage, Bridge Inspection2, bridge maintenance, bridge point cloud, Building condition index, Building decay, building design, Building equipment, Building Information Modeling3, Building Information Modeling (BIM)2, Building Information Modelling, Building performance prediction, built heritage, CAD, CAE, CBAM, cde, citizen participation, city, Civil Engineering Education, Civil Engineers, climate change, Cloud, collaborative management, commercial spaces, Common Data Environment, Compliance Checking, computer vision4, concept, Concrete recycling, CONNECTIA, Constructability, construction2, Construction 5.0 (C5.0), construction contracting, Construction Equipment, Construction Health, Construction Industry2, Construction Management, Construction Risk Management2, construction robot4, Construction Robotics, Construction Site Safety Monitoring, Construction Software, construction task, Construction tools, Conveyor Belt, Convolutional Neural Network, CoT, Crack Segmentation, Crowdsourcing, curriculum development, curtain wall, Danger analysis, Data-Efficient Fine-tuning Strategy, data integration, data management, data transmission, dataset, debris flow2, decision making, deep learning9, defect detection, Defect segmentation, design strategies, Differential Render, diffusion model2, Digital Delivery, digital technology, Digital Transformation, Digital Twin8, Digital Twins, Discrete Event Simulation, distributed systems, Domain-Tailored Large Vision-Language Model, Drawing processing, Drones, DX, Education, efficient simulation, Electroencephalograph (EEG), Embodied carbon assessment, EMG, EMS, Enclosure Walls, energy consumption, engineering and construction, Equipment Detection, Ergonomic, ergonomic risk, ESG (Environmental Social and Governance), ESG decision-making, Evacuation performance simulation, external load, eye tracking, Facade photovoltaic potential, Fall, false alarm rate, FEM, FEMA P-58, fine-tuning, Fire Safety Compliance, Fire Safety Equipment, Fire safety inspection, Floor Area Calculation, Floorplan generation, Frame skip, game engine, GAT, gaze estimation, GenAI risks, Generative AI2, Generative AI design, generative design2, Genetic Algorithm, geometric digital twinning, Geometric quality inspection, Geometry extraction, GIS, Graph Attention Network, Graph Neural Network3, Graph Neural Networks2, graph theory, Grasping, Ground-based cloud images, ground reaction forces, Hand Gesture, heritage building, Heritage Building Information Modeling, high resolution image, Highway maintenance, Historical buildings, HoloLens, housing supply, Human-AI Trust, Human-Centered Robotics, human-machine collaboration, human-machine interaction, Human-Robot Collaboration, Human-Robot Collaboration (HRC), hydropower plant, ICT Efficacy, IFC3, IFC Information Extraction, image representation, image retrieval, image segmentation, Implementation Framework, implication, indoor environment quality, Indoor Environment Simulation, Indoor modeling, Industry 5.0 (I5.0), Information Container, Information Extraction, information management2, Infrastructure maintenance, Infrastructure resilience, Initial Velocity, Inspection, instance segmentation, Institutional pressure, Integrated knowledge base, Intelligent construction, intention recognition, Interaction force, interior design, International contractors, Internet of Things (IoT), job-housing balance, Kalman filter, Key Performance Indicators, Knowledge Graph3, Knowledge Management, Language-embedded 3D Gaussian Splatting, Large Language Model (LLM)2, large language models2, Large-scale prefabricated storage yard, Laser-induced breakdown spectroscopy (LIBS), laser scanning2, layout design, learned image compression, LiDAR2, Life Cycle Assessment, Lifting safety, Lightweight Transfer Learning, limited data, LLM2, LLM Agent, Load inversion, LOOK Algorithm, low back pain, low-light environment, LSTM2, machine learning2, machine vision, Maintenance, Markov Decision Process (MDP), Masonry structure, MEP2, meta-learning, MIC, Mixed Reality, Mobile monitoring, model conversion, Mongolian Construction Industry, motion recognition, multi-label text classification, Multi-modal Safety Compliance Checking, multi-objective optimization2, Multi-occupancy Building Layout, multi-robot coordination, Multimodal Large Language Models, natural disasters, natural language interaction, Natural Language Processing2, nearest neighbor, NeRF (Neural Radiance Fields), New citizens, NFT, Night clouds, NSGA-III, object detection4, object tracking2, Offsite Construction2, OHCA, open data, Operational Phase Monitoring, Panoramic inspection, Performance-based evaluation, PESTLE analysis, pickup and delivery problems, Plastics Waste dataset, PM2.5, point cloud3, point cloud completion, positions, Practice Alignment, prefabricated components, Problem-Based Learning (PBL), process optimisation, professional practice, Progress identification, Prompt Pattern, public procurement, quality control, quality inspection, quality visualization, ray tracing, RC frame structures, Rebar Design, Rebar Inspections, recovery, Recycled coarse aggregates (RCA), Reinforced concrete beams, Reinforcement Learning, Rendering technique, Residential block, response time, review, risk perception, Road infrastructure, Road Maintenance2, Road pavement management, robot adoption, Robots, RULA, safety in construction, safety management, Scan-to-BIM, Scene Understanding, scheduling optimization, Segment Anything Model, seismic loss estimation, Semantic enriched, semantic segmentation2, semantic segmentation model, simulation, Simultaneous Localization and Mapping, Skill Enhancement, slip, Small sample training, smart contract3, SMEs, solar irradiation prediction, spatial analysis, Spatial Relationship Query, Spatial vitality, Spatio-temporal heterogeneity, sports venues, Streetlight detection, Structural component size design, Structural Engineering, Structural Health Monitoring, student engagement, Substation, surface reconstruction, surrogate model, survey, Sustainability3, Sustainable building design, Sustainable Development Goals (SDGs), SWOT analysis, Synthetic point cloud, task allocation, task complexity, Technology Acceptance Model, technology adoption, Technology Misalignment, Technology Readiness Level, Tender phase, Three-dimensional modeling, Tower crane layout planning, Tower crane operators, traffic safety, Trans-dimensional Markov chain, transformer2, Transmission and Distribution networks, Treadmill, Trip, tunnel, tunnel construction, UAV remote sensing, UAV/UGV integration, Underground structures, UNet, UNet++, Unity, Unmanned Aerial Vehicle (UAV), User Discomfort, vacant housing, Virtual Construction Safety Assistant, Virtual Reality, Virtual scan, Vision language model (VLM), Vision Large Language Models (vLLM), visual positioning, Visual Question Answering (VQA), Visual SLAM, voxel, waste management, Water Body Segmentation, wearable robots, web-based application, Welding operations, WMSD, Worker Acceptance, Worker-robot collaboration, Worker Trajectory Prediction, YOLOv10-N, YOLOv5.