Days: Sunday, August 21st Monday, August 22nd Tuesday, August 23rd Wednesday, August 24th
View this program: with abstractssession overviewtalk overview
Registration at École de technologie supérieure (ÉTS)
15:00 | Proposition d’un modèle d’estimation de la complexité géométrique d’un produit usiné basé sur la maquette 3D ( abstract ) |
15:25 | A dynamic lot-sizing-based profit maximization discounted cash flow model considering working capital requirement financing cost with infinite production capacity ( abstract ) |
15:50 | STAFFING OPTIMIZATION WITH CHANCE CONSTRAINTS FOR EMERGENCY CALL CENTERS ( abstract ) |
16:15 | The Selection of Harvest Areas and Wood Allocation Problem – Multi-Objective Optimization ( abstract ) |
16:40 | Stratégie intégrée de maintenance et de contrôle de la qualité dans les systèmes manufacturiers ( abstract ) |
17:05 | A Generic Framework for Analyzing the Sustainable Integration of New Products: An Application to the Forest Value Chain ( abstract ) |
Welcoming Cocktail ( Salle des pas perdus, ÉTS )
View this program: with abstractssession overviewtalk overview
Registration
Welcome Message
PLENARY 1 - Big Data and Mixed-Integer Programming
09:00 | Big Data and Mixed-Integer Programming ( abstract ) |
Coffee Break ( Salle des pas perdus )
Modélisation et Optimisation – Applications [FR]
Bruno Agard (École Polytechnique de Montréal, Canada)
10:20 | GENETIC ALGORITHM FOR THE INSPECTION OF DEFORMABLE BODIES BY ADAPTING THE COHERENT POINT DRIFT ALGORITHM ( abstract ) |
10:45 | Problème d’optimisation de la production sous contrainte de l’emission de carbone ( abstract ) |
11:10 | Les aspects importants dans la modélisation des Systèmes Manufacturiers Cellulaires Dynamiques (SMCD) ( abstract ) |
11:35 | L'utilisation des SIG comme outil d'aide à la décision d'expansion commerciale: une étude de cas aux détaillants d'alcool à Laval ( abstract ) |
Planification forestière [FR]
10:20 | Réingénierie du processus de planification opérationnelle d'un système de production multi-usines ( abstract ) |
10:45 | Déploiement des ressources de lutte aux feux de forêts ( abstract ) |
11:10 | Approche multiobjective pour l’évaluation de la soutenabilité des bioraffineries intégrées aux Pates et Papiers ( abstract ) |
11:35 | TOWARD DECISION THEATER DESIGN FOR COMMUNITY FOREST MANAGEMENT & PLANNING: THE CASE OF QUÉBEC ( abstract ) |
Optimisation Chaîne Logistique (1) [FR]
10:20 | ОPTIMISАTIОN D’UNE CHАINЕ LОGISTIQUЕ HОSPITАLIЕRЕ EN FAISANT APPEL AU SOUS-TRAITANCE ( abstract ) |
10:45 | Optimisation conjointe des flux physiques et financiers de la chaine logistique en difficulté de trésorerie ( abstract ) |
11:10 | GESTION DE LA PRODUCTION ET OPTIMISATION DE LA DISTRIBUTION : CAS DE L'ENTREPRISE CANDIA BEJAIA (ALGERIE) ( abstract ) |
11:35 | IMPACT DES RISQUES LIES A LA CHAINE LOGISTIQUE SUR LA RUPTURE EN LINEAIRE : ETUDE D’UN CAS REEL DANS LA GRANDE DISTRIBUTION ( abstract ) |
Production et Maintenance [FR]
10:20 | ОPTIMISАTIОN D’UNE STRATEGIE DE MAINTENANCE INTEGREE POUR UN SYSTEME MULTI-MACHINES SOUS UN CONTRAT DU LEASING AVEC GARANTIE ( abstract ) |
10:45 | Politique d'inspection séquentielle basée sur la dégradation de la qualité de la mesure des tubes de Pitot ( abstract ) |
11:10 | Planification de la production de la maintenance préventive opportuniste pour un système manufacturier non fiable produisant deux types de produits ( abstract ) |
11:35 | Stratégie intégrée de maintenance et de contrôle de la qualité dans les systèmes manufacturiers ( abstract ) |
Simulation [ENG]
10:20 | DISCRETE EVENT SIMULATION OF THE IMPACT OF TRAIN SORTING STRATEGIES ON SHUNTING OPERATIONS ( abstract ) |
10:45 | SIMULATION OF A SINGLE LINE RAILWAY OPERATION: THE CASCAVEL-GUARAPUAVA CASE ( abstract ) |
11:10 | MANAGING WAREHOUSE INVENTORY: A SIMULATION BASED CASE STUDY ( abstract ) |
11:35 | MATLAB/SIMULINK -VS- ARENA/OPTQUEST: OPTIMAL PRODUCTION CONTROL OF UNRELIABLE MANUFACTURING SYSTEMS ( abstract ) |
LUNCH
PLENARY 2 - Modélisation et optimisation de la conception des moteurs d'avions
13:15 | Modélisation et optimisation de la conception des moteurs d'avions ( abstract ) |
Optimisation des systèmes de transport [FR]
Farouk Yalaoui (University of Technology of Troyes, France)
14:15 | Planification robuste de matériel ferroviaire roulant intégrant les temps d'immobilisation en gare ( abstract ) |
14:40 | RECHERCHE A VOISINAGE VARIABLE POUR LE PROBLEME D’APPROVISIONNEMENT EN CHARGEMENT COMPLET DE GAZ GPL ( abstract ) |
15:05 | OUTIL DE SIMULATION POUR L’ETUDE DE LA RESILIENCE ET L’OPTIMISATION DE LA GESTION DES RESEAUX DE VOIES NAVIGABLES ( abstract ) |
15:30 | PROBLEME DE COLLECTES ET LIVRAISONS AVEC FENETRE DE TEMPS ET FLOTTE HETEROGENE ( abstract ) |
SS - Modeling and simulation along the supply chain of the forest products industry [ENG]
14:15 | THE TRANSPORTATION GAME ( abstract ) |
14:40 | DYNAMIC HORIZONTAL COLLABORATION FOREST SUPPLY CHAIN TRANSPORTATION ( abstract ) |
15:05 | Spatial Dispersion Minimization Using Clustering in the Context of the Selection of Harvest Areas and Wood Allocation ( abstract ) |
15:30 | A Generic Framework for Analyzing the Sustainable Integration of New Products: An Application to the Forest Value Chain ( abstract ) |
Planification et Ordonnancement [FR]
14:15 | Méthodes exactes pour la résolution d'un problème d'ordonnancement Open-shop avec contraintes de ressources ( abstract ) |
14:40 | Validation d'un plan de production minier à court terme par simulation ( abstract ) |
15:05 | Problème de lot-sizing dans un système de type flow-shop à capacité finie et avec considération énergétique ( abstract ) |
15:30 | ORDONNANCEMENT D’ATELIERS A PARTIR DE PATRONS DE MODELISATION BASES SUR DES AUTOMATES COMMUNICANTS ( abstract ) |
Supply Chain and production planning [ENG]
Marc Paquet (École de technologie supérieure, Canada)
14:15 | ROBUST OPTIMIZATION FOR MINE PLANNING ( abstract ) |
14:40 | A dynamic lot-sizing-based profit maximization discounted cash flow model considering working capital requirement financing cost with infinite production capacity ( abstract ) |
15:05 | The Top Approaches for managing supply chain social risk and social sustainability ( abstract ) |
15:30 | A multi-period production and distribution optimization model for the radiopharmaceutical industry ( abstract ) |
Manufacturing / Remanufacturing [ENG]
14:15 | CAPACITY AND CARBON PLANNING UNDER A CAP-AND-TRADE SCHEME ( abstract ) |
14:40 | Hybrid Control of processing/reprocessing rates for a deteriorated manufacturing system ( abstract ) |
15:05 | ADAPTIVE CONTROL OF HYBRID FAILURE-PRONE MANUFACTURING SYSTEMS UNDER DEMAND VARIATION AND UNCERTAINTY ( abstract ) |
15:30 | JOINT OPTIMAL PRODUCTION AND REPLACEMENT POLICY FOR A DETERIORATED CLOSED-LOOP MANUFACTURING SYSTEM ( abstract ) |
Coffee Break ( Salle des pas perdus )
Optimization Applications in Logistics [ENG]
16:20 | IMPROVED SOLUTION METHODS FOR CAPACITATED MULTI-FACILITY WEBER PROBLEM ( abstract ) |
16:45 | END OF LIFE VEHICLES MANAGEMENT: CASE OF TURKEY ( abstract ) |
17:10 | MIXED INTEGER FORMULATION FOR A JOINT LOT-SIZING AND MAINTENANCE PLANNING PROBLEM IN A DETERIORATING SYSTEM ( abstract ) |
SS – Ingénierie et management des organisations de santé (1) [FR]
16:20 | VERS UNE PRISE EN CHARGE PERSONNALISEE A DOMICILE ( abstract ) |
16:45 | CONTRIBUTION A L’ORGANISATION DES SOINS EN EHPAD ( abstract ) |
17:10 | UNE DÉMARCHE OUTILLÉE À BASE DE RTLS, PROCESS MINING ET SIMULATION POUR LE DIAGNOSTIC ORGANISATIONNEL DES PARCOURS PATIENTS EN ÉTABLISSEMENT HOSPITALIER ( abstract ) |
Supply Chain Decisions Making [ENG]
16:20 | STAFFING OPTIMIZATION WITH CHANCE CONSTRAINTS FOR EMERGENCY CALL CENTERS ( abstract ) |
16:45 | Competition and cost-sharing mechanism for collaborative product quality improvement ( abstract ) |
17:10 | Service pooling strategy in service systems with impatient customers ( abstract ) |
Logistique et transport [FR]
16:20 | MODELING OF AUTOMATIC TRAIN OPERATION CONTROL USING COLORED PETRI NETS ( abstract ) |
16:45 | URBAN FREIGHT BY RAIL: A COUPLED SIMULATION–OPTIMIZATION APPROACH FOR OPTIMIZING TRANSPORT OF GOODS ( abstract ) |
17:10 | New genetic operator for the full truckload vehicle routing problem with profit ( abstract ) |
Opening Ceremony and Cocktail [Pointe-à-Callière - History museum in Montreal]
View this program: with abstractssession overviewtalk overview
Registration
PLENARY 3 - Healthcare Engineering : An analytical approach
08:45 | Healthcare engineering: An analytical approach ( abstract ) |
Coffee Break ( Salle des pas perdus )
Gestion de la chaîne logistique (2) [FR]
10:05 | METHODOLOGIE POUR LA PRISE EN COMPTE DE L’INCERTAIN DANS L’OPTIMISATION EVOLUTIONNISTE VIA SIMULATION ( abstract ) |
10:30 | UTILISATION DE LA SIMULATION DANS LA CONCEPTION DES SYSTEMES LOGISTIQUES RECONFIGURABLES ( abstract ) |
10:55 | Système hybride flou multicritère à base de connaissance pour la sélection des systèmes d’entreposage des charges palettisées ( abstract ) |
11:20 | PROTECTION COLLABORATIVE DES RESEAUX LOGISTIQUES ( abstract ) |
SS - Maintenance and Production [ENG]
10:05 | Development of integrated maintenance-quality policies for an imperfect manufacturing system. ( abstract ) |
10:30 | STUDY OF TWO CASES OF GREEN TRANSPORT TAKING INTO ACCOUNT MAINTENANCE COSTS ( abstract ) |
10:55 | JOINT MAINTENANCE AND PRODUCTION PLANNING IN A DETERIORATING SYSTEM: MODEL AND SOLUTION METHOD ( abstract ) |
11:20 | Performance-Based Maintenance Decision Support System (MDSS) in snow disposal context ( abstract ) |
SS – Outils, méthodes, techniques et systèmes d’information appliqués à la gestion de projet [FR]
Robert Pellerin (École Polytechnique de Montréal, Canada)
10:05 | Analyse du BIM appliqué à la rénovation ( abstract ) |
10:30 | BIMOV: ANALYSE AUTOMATIQUE DE NAVIGABILITE DANS LES BATIMENTS ( abstract ) |
10:55 | Review of business transformation Frameworks: A project Management Perspective ( abstract ) |
11:20 | Influence de la gestion du risque dans le processus de développement produit en aéronautique. ( abstract ) |
Optimisation énergétique [FR]
10:05 | Impact de la disponibilité de la ressource énergétique sur la gestion d'un micro-réseau résidentiel ( abstract ) |
10:30 | Gestion prédictive d'un micro-réseau résidentiel ( abstract ) |
10:55 | Prévision infra-horaire de l'éclairement normal direct pour la gestion de centrales CSP ( abstract ) |
11:20 | Estimation de l'éclairement normal direct par ciel clair ( abstract ) |
Modélisation - Optimisation [FR]
10:05 | DISCRÉTISATION DU PSO SUR UNE BASE COMMUNE ( abstract ) |
10:30 | Méthode du noyau et stabilité forte dans l'approximation de la probabilité de ruine ( abstract ) |
10:55 | Stabilité forte de la distribution stationnaire du temps d'attente par le concept de dualité ( abstract ) |
11:20 | PARALLELISATION DE LA METHODE PSO SUR DES VOISINAGES EVOLUTIFS ( abstract ) |
Lunch
PLENARY 4 - Simulation-driven Product Development: An Electrical Engineering Perspective
13:30 | Simulation-driven Product Development: An Electrical Engineering Perspective ( abstract ) |
SS -Sustainable Supply Chain [ENG]
14:15 | SUSTAINABLE SUPPLY CHAIN DESIGN: TOWARDS A FRAMEWORK FOR MEASURING ROBUSTNESS ( abstract ) |
14:40 | COLLABORATION IN SUSTAINAIBLE SUPPLY CHAINS: A SYSTEMATIC LITERATURE REVIEW ( abstract ) |
15:05 | MULTI-OBJECTIVE OPTIMIZATION FOR A SUSTAINABLE SUPPLY CHAIN DESIGN: THE CASE OF A NORTH-AMERICAN FROZEN FOOD SUPPLY CHAIN ( abstract ) |
15:30 | The Impact of Wood Waste Recycling on Reverse Logistics Network Design: the case of the CRD Industry ( abstract ) |
Fiabilité et Internet des objets [FR]
14:15 | Computerized Algorithms for Determining the Reliability of physical Systems ( abstract ) |
14:40 | MAINTENANCE STRATEGY IN FATIGUE BASED ON THE HASOFER-LIND RELIABILITY INDEX ( abstract ) |
15:05 | NEURAL NETWORK MODEL FOR PROGNOSTIC AS A SERVICE IN PRIVATE CLOUD COMPUTING ( abstract ) |
15:30 | An IoT-based solution for Post-Prognostics Decision in Cloud computing environment ( abstract ) |
Modeling – Product development [ENG]
14:15 | CAD/TOLERANCING INTEGRATION: MECHANICAL ASSEMBLY WITH FORM DEFECTS ( abstract ) |
14:40 | Proposition d’un modèle d’estimation de la complexité géométrique d’un produit usiné basé sur la maquette 3D ( abstract ) |
15:05 | PRODUCT DEVELOPMENT AND IMPROVEMENT ( abstract ) |
15:30 | REVUE LITTÉRATURE SUR LA GESTION DE PERFORMANCES EN DÉVELOPPEMENT DE PRODUITS –CAS DE L’INDUSTRIE AÉRONAUTIQUE - ( abstract ) |
SS- Modeling and simulation along the supply chain of the forest products industry [ENG]
14:15 | A time decomposition heuristic for integrated tactical planning in the lumber supply chain ( abstract ) |
14:40 | The Selection of Harvest Areas and Wood Allocation Problem – Multi-Objective Optimization ( abstract ) |
15:05 | OPTIMIZATION OF HARVEST PLANNING OF FOREST STANDS INFESTED BY SPRUCE BUDWORM USING STOCHASTIC PROGRAMMING ( abstract ) |
15:30 | Forest Biomass Value Chain Design ( abstract ) |
Logistique inverse [FR]
14:15 | QUELLES STRATEGIES POUR LE MANAGEMENT DE LA CHAINE LOGISTIQUE INVERSE DANS LA GRANDE DISTRIBUTION ? ( abstract ) |
14:40 | Analyse d’efficacité de systèmes d’assemblage/désassemblage avec machines non fiables : approche analytique et simulation ( abstract ) |
15:05 | COUPLAGE DE L’OPTIMISATION ET DE LA SIMULATION POUR LA CONCEPTION DES SYSTEMES D’ASSEMBLAGE/DESASSEMBLAGE ( abstract ) |
15:30 | HEURISTIQUES POUR LE PROBLÈME DE LOT SIZING EN DÉSASSEMBLAGE ( abstract ) |
Coffee Break ( Salle des pas perdus )
Commande des systèmes manufacturiers [FR]
16:20 | CONTRIBUTION A LA COMMANDE DES SYSTÈMES A ÉVÉNEMENTS DISCRETS TEMPORISES (SEDTS) ( abstract ) |
16:45 | VERIFICATION FORMELLE DE CHAINES DE CONTROLE-COMMANDE D'ELEMENTS DE CONCEPTION STANDARDISES ( abstract ) |
17:10 | CLASSIFICATION ET ANALYSE DES PISTES DE RECHERCHE RELATIVES AU CONWIP ( abstract ) |
Amélioration des performances [FR]
16:20 | Le WIP concurrent : une proposition de file d'attente du point de vue du produit pour caractériser le temps de cycle ( abstract ) |
16:45 | The impact of parts obsolescence on organization’s performances: a case study in the aeronautic industry ( abstract ) |
17:10 | LEAN EN DEVELOPPEMENT DE PRODUITS APPLIQUEE A LA GESTION DU CHANGEMENT ( abstract ) |
Transport Optimization [ENG]
16:20 | 3D REFERENCE TRAJECTORY OPTIMIZATION FOR A COMMERCIAL AIRCRAFT USING A GRAPH SEARCH ALGORITHM ( abstract ) |
16:45 | VERTICAL REFERENCE TRAJETORY OPTIMIZATION AND SIMULATION FOR A COMMERCIAL AIRCRAFT ( abstract ) |
17:10 | Agents negotiating to meet the On-Demand Transport problem ( abstract ) |
Ordonnancement [FR]
16:20 | A mathematical model to assess the performance of a robotic kitting system in an assembly plant ( abstract ) |
16:45 | Empirical Improvements of a dynamic scheduling engine in an industrial environment ( abstract ) |
17:10 | FIRST EXPERIMENT OF STORM FOR DESIGN OF EFFICIENT OPTIMIZATION METHODS: APPLICATION TO THE JOB-SHOP WITH TIME LAGS ( abstract ) |
Gala Dinner - Windsor [ http://lewindsormontreal.com/fr ]
View this program: with abstractssession overviewtalk overview
Registration
PLENARY 5 - Modelling and Simulation of Aircraft at Bombardier
09:00 | Modelling and Simulation of Aircraft at Bombardier ( abstract ) |
Coffee Break ( Salle des pas perdus )
SS – Pilotage des systèmes de production de soins en milieu incertain [FR]
10:20 | SYSTEME MULTI-AGENTS DE PILOTAGE DU FLUX DE PATIENTS ( abstract ) |
10:45 | WALK-IN CLINICS WORKING IN NETWORK ( abstract ) |
11:10 | THE ANALYSIS OF APPLICATION OF ISO 55000 CONCEPTS IN HOSPITAL CONTEXT: THE CASE OF CT SCANNER LIFE CYCLE MANAGEMENT IN A QUEBEC PUBLIC HOSPITAL ( abstract ) |
11:35 | A STOCHASTIC MODEL FOR RESOURCE OPTIMIZATION IN EMERGENCY DEPARTMENT ( abstract ) |
Simulation en foresterie [FR]
10:20 | Application of optimization in forest value chain planning ( abstract ) |
10:45 | Application of simulation in wood yards ( abstract ) |
11:10 | THE SIMULATION OF WOOD CHIPS TRANSPORT ( abstract ) |
Gestion de l'innovation [FR]
10:20 | Innovation in eco design by using Eca Triz method ( abstract ) |
10:45 | LE CONCEPT DE TÂCHES EN CONCEPTION SÛRE D’EQUIPEMENTS DE TRAVAIL ( abstract ) |
11:10 | Écoinnovation pour les PMO: caractérisation d'un modèle basé sur la gestion des connaissances ( abstract ) |
11:35 | L'éco-innovation pour les petites et moyennes entreprises (PME): caractérisation d'un modèle basé sur la gestion des connaissances ( abstract ) |
Uncertainty and Risk Modeling [ENG]
10:20 | Some application results for components importance measures of binary coherent systems ( abstract ) |
10:45 | Notes on the Mean Residual Life Function of Coherent Systems: Ap-plication for a Reliability System’s Structure ( abstract ) |
11:10 | THE USE OF GREY SYSTEMS THEORY IN COMPLEX DECISION PROBLEMS UNDER UNCERTAINTY ( abstract ) |
11:35 | Quelques méthodes d'approximation des probabilités de ruine et application au modèle de Lundberg ( abstract ) |
SimWell – MOSIM Arena Basic Training - Part 1
Lunch
Enterprise visit - Bombardier Produits récréatifs [http://www.brp.com/fr-ca/homepage]
SimWell – MOSIM Arena Basic Training - Part 2