Download PDFOpen PDF in browser

Towards Better Road Contractor Performance

EasyChair Preprint no. 2394

13 pagesDate: January 15, 2020

Abstract

Public Works Department (PWD) is heavily involved in road project management whether the project is conventional in-house, consultant or design and built. The performance of this project will depend on the performance of the contractor who executes the project. Thus, it is important that the appointed contractor performs well to ensure that the project can be completed within the specified time, cost and quality stipulated. To ensure that only the best contractor is chosen, it is important to have a database on the evaluation of contractor’s performance. This paper proposes the best method to evaluate contractor performance comprehensively. The evaluation encompasses all aspects during construction including site organisation, administration, planning work progress, work quality, and the control of nominated subcontractors or suppliers. The assessments were done every six months and the mark given can be converted into grades to categorise each contractor’s performance. These assessments not only provide the data of contractor performance but will motivate contractors to perform at their peak throughout the project period.

Keyphrases: assessments, Contractor, Performance

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@Booklet{EasyChair:2394,
  author = {Ir Shamsuddin Sabri and Ir Mohd Erie Husairrie Ismail and Mohd Nazri Ali and Rohayu Abd Aziz},
  title = {Towards Better Road Contractor Performance},
  howpublished = {EasyChair Preprint no. 2394},

  year = {EasyChair, 2020}}
Download PDFOpen PDF in browser