| ||||
| ||||
![]() Title:Data-Driven Maintenance and Setup Time Optimization: a TPM 4.0 and SMED in a Metalworking SME Dedicated to Rubber Lining Authors:Anderson Geanpierre Acosta Quispe, Fernando Timoteo Romero Toledo, Rafael Alberto Ortiz Condori and Rosa Fernanda Salas Castro Conference:TMREES26Lb Tags:discrete event simulation, Machine availability, rubber lining, SME TPM 4.0 and SMED Abstract: Small and medium-sized metalworking enterprises often experience production losses due to breakdowns and prolonged setup times. This study examines a Peruvian SME engaged in rubber lining, with an initial machine availability of 62 %, whose main operational constraints are mechanical failures and setup times. An integrated model combining SMED to reorganize setup activities and Total Productive Maintenance 4.0 (TPM 4.0) to support condition-based maintenance planning was designed. The proposal includes advance material preparation, changeover standardization, vibration and pressure monitoring, and operational alerts. Its expected effects were assessed using discrete-event simulation in Simio, with 30 replications of the current (AS-IS) and proposed (TO-BE) scenarios. The simulated results indicate a weighted availability of 94.40 %, a 29.98 % reduction in setup times, and a 43.59 % decrease in mean repair time. These findings suggest that an integrated solution adapted to limited resources could improve equipment utilization. Data-Driven Maintenance and Setup Time Optimization: a TPM 4.0 and SMED in a Metalworking SME Dedicated to Rubber Lining ![]() Data-Driven Maintenance and Setup Time Optimization: a TPM 4.0 and SMED in a Metalworking SME Dedicated to Rubber Lining | ||||
| Copyright © 2002 – 2026 EasyChair |
