TALK KEYWORD INDEX
This page contains an index consisting of author-provided keywords.
| 3 | |
| 3D deep learning | |
| 3D printing | |
| 3D reconstruction | |
| 3D segmentation | |
| 4 | |
| 4D Simulation | |
| 5 | |
| 5D BIM | |
| A | |
| activity recognition | |
| AEC | |
| AECO | |
| AECO industry | |
| AI | |
| Air Handling Unit | |
| Analytical Methods | |
| Architecture Engineering Construction and Operation Industry | |
| Artificial Intelligence | |
| Artificial Intelligence Agent | |
| As-Built-Model | |
| Asia BIM Adoptions | |
| Asset Information Management | |
| Asset information requirements | |
| Asset management | |
| Augmented Reality | |
| Automated Building Compliance Checking | |
| Automated Code Compliance Checking | |
| Automated prevention through design and planning | |
| Automated valuation models | |
| Automatic Compliance Checking | |
| automatic scenario generation | |
| Autonomous Compliance Checking | |
| B | |
| BACnet | |
| Bibliometrics | |
| Bidirectional Encoder Representations from Transformers (BERT) | |
| Bidirectional Long Short Term Memory (BiLSTM) | |
| Bids evaluation | |
| BIM | |
| BIM Information Reliability | |
| BIM Level 3 | |
| BIM Standards and Guidelines | |
| BIM-GIS integration | |
| BIM_GIS integration | |
| Blockchain | |
| BMS | |
| BPMN | |
| BPMN 2.0 | |
| Brick Schema | |
| Bridges | |
| building authority | |
| Building Energy Modeling | |
| Building Information Model(BIM) | |
| Building Information Modeling | |
| Building Information Modeling (BIM) | |
| Building Information Modelling | |
| Building Information Modelling (BIM) | |
| building operation | |
| building performance | |
| building permission process | |
| building permitting | |
| Building products | |
| BuildingSmart Data Dictionary | |
| Built Assets | |
| C | |
| CAD/CAM systems | |
| CAM | |
| Carbon data | |
| case study | |
| Circular Economy | |
| Citizen science | |
| CityGML | |
| Classification | |
| Co-creation | |
| Code compliance checking | |
| Cognitive Digital Twin (CDT) | |
| Common Data Environment | |
| Community engagement | |
| compliance checking | |
| Computational Design | |
| Computational Design (CD) | |
| Computer Vision | |
| Concept Design | |
| Concrete element supply chain | |
| Configuration | |
| Construction | |
| Construction 4.0 | |
| Construction and Demolition Waste | |
| construction code compliance checking | |
| Construction Engineering | |
| Construction management education | |
| construction monitoring | |
| construction progress | |
| Construction safety | |
| Construction sector | |
| Construction Technology | |
| Construction Training | |
| Convolutional Neural Network (CNN) | |
| Cost estimation | |
| Cross-Laminated Timber (CLT) | |
| Cross-system analysis | |
| Crowdsourcing | |
| Cultural Heritage | |
| D | |
| Data Analysis | |
| Data architecture | |
| Data management | |
| data streaming | |
| Decision-making | |
| Delays | |
| Design phase | |
| DevOps | |
| digital authentication | |
| Digital Building Logbook | |
| Digital Building Permit Checking | |
| Digital Fabrication | |
| Digital Model | |
| digital signature | |
| Digital Transformation | |
| Digital Twin | |
| Digital Twin Construction | |
| Digital Twin for Construction Safety | |
| Digital Twins | |
| Digital Twins Maturity | |
| Digital-Physical Coupling | |
| Digitalisation | |
| Digitalization of the built asset industry | |
| digitization | |
| Diminished Reality | |
| E | |
| education | |
| Efficiency | |
| Embodied carbon | |
| Energy consumption | |
| energy efficiency | |
| energy renovation | |
| Engineer to Order (ETO) | |
| Engineering education | |
| Environmental Impacts Assessment | |
| F | |
| Fabrication | |
| Facility and asset management | |
| Facility Management | |
| fault detection | |
| façade | |
| Fire Safety | |
| G | |
| Gaming | |
| generalized LLM-augmented BIM framework | |
| Generative Adversarial Network (GAN) | |
| Generative AI | |
| Geographic Information System (GIS) | |
| Geometry | |
| Graph learning | |
| Graph representation | |
| Graph-based methods | |
| Green Public Procurement | |
| H | |
| Harmonised Requirements | |
| Hazard prevention | |
| Heterogenous Data | |
| High Volume/Low Product Mix (HVLM) | |
| Highway asset | |
| Historical Building Information Modeling | |
| human collaboration | |
| Human-Robot Collaboration | |
| HVAC prefabrication | |
| I | |
| IDM | |
| IDS | |
| IDS process model | |
| IFC | |
| IfcOWL | |
| Immersive Learning | |
| Implementation | |
| Indigenous | |
| IndoorGML | |
| Industry Foundation Classes | |
| Industry Foundation Classes (IFC) | |
| Industry meets Research | |
| Industry survey | |
| Information Management | |
| Information models | |
| Information Requirements | |
| Information Security | |
| Infrastructure | |
| Innovation | |
| inspection | |
| Integrated Project Delivery | |
| Integration | |
| Interoperability | |
| interpret-fill-match-structure-execute-check | |
| Investment | |
| IoT | |
| IPD | |
| ISO 19650 | |
| K | |
| Knowledge Discovery | |
| Knowledge Graphs | |
| Knowledge management | |
| KPIs | |
| L | |
| Labeled Property Graph | |
| labor productivity | |
| Large Language Model | |
| large language model (LLM) | |
| Large language models | |
| large language models (LLM) | |
| lca | |
| Lean | |
| Lean and Safe Construction Site Layout Planning | |
| lean construction | |
| Learning | |
| Learning Capabilities | |
| Level of Information Need | |
| Level of information need (LOIN) | |
| Life Cycle Analysis | |
| Life cycle assessment (LCA) | |
| Light exposure | |
| Linked Data | |
| Literature Review | |
| Local Issues | |
| M | |
| Machine learning | |
| Maintenance planning | |
| Manufacturing Bill of Materials (M-BOM) | |
| manufacturing industry | |
| Manufacturing to the Stock (MTS) | |
| Master Scheduling | |
| material passport | |
| Material Requirements Planning (MRP) | |
| Measurement | |
| Mental Health Facilities | |
| MEP | |
| Metadata model | |
| methodology | |
| Mixed Methods | |
| Mixed Reality | |
| Model Predictive Control | |
| modeling | |
| Modular | |
| Modular ontology modeling | |
| multi-schema integration | |
| Multimodal inputs | |
| MVD | |
| N | |
| Natural Language Generation (NLG) | |
| Natural Language Processing (NLP) | |
| Natural Language Understanding (NLU) | |
| Neural Network | |
| Next-Generation Digital Twins | |
| O | |
| Object | |
| Object detection | |
| off-site construction | |
| Ontologies | |
| Ontology | |
| open source | |
| openBIM | |
| OpenStreetMap | |
| Optimization | |
| P | |
| Pathology Diagnosis | |
| Pedestrian and evacuation dynamics | |
| Performance-based approach | |
| Personalized learning and feedback | |
| PIM | |
| Plan-Do-Check-Act Cycle | |
| platform | |
| Platforms | |
| Precast Construction | |
| Prediction | |
| Predictive Maintenance | |
| Prefabrication | |
| Preservation | |
| Proactive monitoring and control | |
| Proactive personalized feedback and control | |
| Process modelling | |
| Process Models | |
| product data | |
| product data catalogue | |
| Product Information | |
| Production Planning and Control | |
| Productivity | |
| Project authoring | |
| prompt engineering | |
| Prototyping | |
| Python | |
| R | |
| RDF | |
| REB 22.001 | |
| Recent Developments | |
| renovation | |
| Revit | |
| road quantities | |
| Roads | |
| S | |
| safety | |
| Safety in buildings | |
| Scaffolding systems | |
| scenario technique | |
| Science and Standards | |
| Scientific research | |
| Semantic Enrichment | |
| Semantic technologies | |
| Semantic Web | |
| Semi-structured Interviews | |
| sensor technology | |
| Service-oriented framework | |
| SHACL | |
| simulation | |
| Single-piece flow | |
| Skill Acquisition | |
| Smart Contract | |
| SOSA/SSN | |
| Spatial Linking | |
| speech-to-BIM | |
| Standards | |
| Strategic Planning | |
| Structural fire resistance | |
| Structured Query Language (SQL) | |
| Supply Chain Visibility | |
| sustainability | |
| Sustainability Declarations | |
| T | |
| Takt production | |
| Technology Adoption | |
| Temporary Works | |
| Text mining | |
| text-to-BIM | |
| Timber Structures | |
| Time Scheduling | |
| Tolerance management | |
| Tracking Technologies | |
| Twin transition | |
| U | |
| UAVs | |
| UML | |
| Use Case Definition | |
| Use Cases | |
| V | |
| Value chain | |
| Virtual reality | |
| Visibility Enhancement | |
| vision transformers | |
| Voxels | |
| W | |
| Waste management | |
| Water treatment plant | |
| Wearables sensors (WS) | |
| weekly reports | |
| Work Sampling | |
| Workflows | |
