Tags:Estabilidade Transitória, FMU, Intercâmbio de Modelos, Método Iterativo Alternado, Recursos Energéticos Distribuídos and Simulação no Tempo
Abstract:
This work presents the implementation of an implicit alternating method for the solution of the transient stability problem for a large electrical transmission system. For that, the generating units are implemented by Functional Mock-up Units (FMU) and the transmission system is computed in Python. In this way, the electrical power system is solved through smaller subsystems, while preserving the accuracy of a monolithic simulation.
Simulation Strategy of Electromechanic Transients for Transmission Systems Integrated to FMUs